Structural engineer visited the site on Monday. Met him out there to look at setup. Everything checked out, just a few points to look at to make sure adequate concrete coverage around rebar.
The bigger problem is rain. Project manager also was at site and agreed to postpone the pour until next week. The water will need to be pumped out & lime applied under plastic moisture barrier. Chance if rain all week but looks clear next week. This time waiting is not a problem.