Things are moving forward. We met with the builder and basically received the Bible if the building process. In actuality it's just a binder, but it details our timelines, etc. We've already begun setting up appointments for all the selections.
We also went over the soil report and geo-technical data. We'll be switching over to a Post Tension foundation as per the recommendation of the engineer. The soil is less-suited to the pier/slab construction we had planned. Talking at length with with the soil engineer had to happen first though. (of course). Now if the weather cooperates and begins to dry out, we can get this started. We are still also waiting for finalization by the engineer and permits. Our approval of the foundation helps move all forward.
- Posted using BlogPress from my iPhone
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment